Containment and secondary insulation
Installation
In the case of secondary insulation, the waterproof membrane prevents hazardous materials from entering the soil. During installation, precise fitting and the creation of extra fastening points are important.

Functions
• Storage of hazardous materials
• Storage of high-temperature water
• Industrial and agricultural use


Technological solutions
XR geomembrane: It is recommended for use when storing chemicals or high-temperature water in the reservoir. This geomembrane is extremely resistant to high temperatures, chemical compounds and even extreme weather conditions. Its installation is quick and efficient thanks to the pre-welded, flattened panels.
TRIUS Aqua RPE: Its application guarantees reliable water tightness and long service life. The material has high elasticity, making it extremely resistant and perfectly adapts to the geometry of various reservoirs, whether regular or complex shapes. Its high UV resistance ensures a long service life. And its installation is quick and efficient thanks to the prefabricated panels.
Fast, reliable work
You can choose from various insulation materials, so they adapt to your needs and budget.
Precise work
We perform insulation using the latest technologies, within 3-8 working days.
Precise quality execution
We meticulously plan and prepare every step to ensure the highest quality of work.
How do we work?
We ensure fast, precise, and reliable execution through the following steps:
1. Consultation and assessment
The first step of our work is a detailed consultation, where we discuss the parameters and requirements of your project. We clarify the material quantities with on-site inspections and photographs so that the budget can be calculated in advance.
2. Custom quote
We provide a detailed, competitive quote that includes various insulation materials and solutions. This allows for the comparison of different options, both technically and in pricing.
3. Work process
We take into account the urgency of the task, deadlines and client expectations and schedule the work accordingly, even across multiple shifts or weekends. Smaller tasks are typically completed within 1-2 days.
4. Execution of insulation
The project is carried out with fast and efficient work, even several thousand square meters per day. Our work begins at the time of the quote to ensure that the necessary preparations are made for a fast and safe execution.
We have already helped them!
Discover how we solved our clients' problems – you might find answers to your own questions!
Berhida
Damage protection insulation
Insulation material: XR geomembrane
Szada
Damage tray
Insulation material: TRIUS Aqua RPE

Sóskút
Damage tray
Insulation material: TRIUS Aqua RPE
Don't let damage control insulation cause problems!
Request a custom quote from us and we will help you find the best solution for you.