Fire water reservoirs and their authorization

Installation
Every fire water reservoir must be capable of storing at least 30 m³ of water. The bottom of the reservoir can be a maximum of 7 m from the ground level. The fire water reservoir must be easily accessible for fire trucks and must be located no more than 200 m from the protected building. There should be no slippery surfaces, protruding edges, or stones in the reservoir bed, especially in the case of concrete or blockwork beds.
Functions
• The primary purpose of a fire water reservoir is to provide sufficient water for firefighters in the event of a fire.
• Compliance with fire safety regulations for industrial and larger construction sites, as well as certain residential areas.


Technological solutions
TRIUS Aqua RPE application guarantees reliable water tightness and long lifespan. The material is extremely resistant and flexibly adapts to the geometry of different reservoirs, whether they are regular or complex shapes. Its high UV resistance ensures a long lifespan. Installation is quick and efficient thanks to the prefabricated panels.
Fast, reliable work
You can choose from a variety of insulation materials, tailored to their needs and budget.
Precise work
We perform insulation using the latest technologies, within 3-8 working days.
Precise quality execution
Every step is precisely planned and prepared to ensure the highest quality of work.
How do we work?
We ensure fast, precise, and reliable execution through the following steps:
1. Consultation and Assessment
The first step of our work is a detailed consultation, where we align the parameters and requirements of your project. We clarify the material quantities with on-site inspections and photographs, so that the budget can be calculated in advance.
2. Custom Quote
We provide a detailed, competitive quote that includes various insulation materials and solutions. This allows for the comparison of different options, both technically and in pricing.
3. Work Process
We take into account the urgency of the task, deadlines and client expectations and schedule the work accordingly, even across multiple shifts or weekends. Smaller tasks are typically completed within 1-2 days.
4. Execution of Insulation
The project is carried out with fast and efficient work, even covering several thousand square meters daily. Our work begins at the time of the quote to ensure that the necessary preparations are in place for a quick and safe execution.
We have already helped them!
Discover how we solved our clients' problems – you might find answers to your own questions!
Luck
Fire water tank insulation
Insulation Material: TRIUS Aqua RPE
Nyírbátor
Fire water tank insulation
Insulation Material: TRIUS Aqua RPE

Debrecen
Fire water tank insulation
Insulation Material: TRIUS Aqua RPE
Don't let fire water tank insulation cause problems!
Request a custom quote from us and we will help you find the best solution for you.